TABLE
OF CONTENTS
Introduction
Environmental Monitoring
and Audit Progress
Breaches of Action and
Limit Levels
Reporting Changes
Future Key Issues
Purpose of the report
Structure of the report
Background
Project Organization
Summary of Construction
Works Undertaken During Reporting Month
Construction Programme
Status of Environmental Licences, Notifications and Permits
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters, Frequency
and Duration
Monitoring Methodology
and QA/QC Procedure
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters,
Frequency and Duration
Monitoring Methodology
and QA/QC Procedures
Maintenance and
Calibration
Results and Observations
Event and Action Plan
Monitoring Requirements
Monitoring Parameters,
Frequency
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters
and Frequency
QA/QC Requirements
Results and Observations
Event and Action Plan
6. LAND CONTAMINATION
(AMBIENT ARSENIC MONITORING)
Monitoring Requirements
Monitoring Location
Monitoring Equipment
Monitoring Parameters,
Frequency and Duration
Monitoring Methodology and
QA/QC Procedure
Maintenance/Calibration
Laboratory Measurement /
Analysis
Results and Observations
Event and Action Plan
Monitoring Requirement
Monitoring Parameters
and Frequency
Monitoring Locations
Monitoring Equipment
Results and Observations
Event and Action Plan
Monitoring Requirement
Monitoring Location
Monitoring Parameters
and Frequency
Monitoring Equipment
Results and Observations
Event and Action Plan
Monitoring of Measures
to Minimise Disturbance to Water Birds in Ng Tung
River, Sheung Yue River, Shek Sheung River and Long Valley
Monitoring of Measures
to Minimise Impacts to Ma Tso Lung Stream and Siu
Hang San Tsuen Stream, and Long Valley
Monitoring of Measures
to Minimise Impacts on Ecological Sensitive Habitats
from Disturbance and Pollution
Results and Observation
References
10 ENVIRONMENTAL SITE INSPECTION
Site Audits
Implementation Status of
Environmental Mitigation Measures
Implementation Status of
Water Quality Mitigation Measures
Solid and Liquid Waste
Management Status
Ecological Mitigation
Measures – Creation of Long Valley Nature Park (LVNP)
11 ENVIRONMENTAL NON-CONFORMANCE
Summary of Exceedances
Summary of Environmental
Non-Compliance
Summary of Environmental
Complaint
Summary of Environmental
Summon and Successful Prosecution
Key Issues in the Coming
Three Months
Monitoring Schedule for
the Next Month
Construction Programme for the Next Month
13 CONCLUSIONS AND
RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table
I Works
Contracts under relevant Environmental Permit(s) in the Reporting Month
Table
II Summary
Table for EM&A Activities in the Reporting Month
Table
III Summary
Table for Events Recorded in the Reporting Month
Table IV Summary
Table for Site Activities in the coming Three Months
Table 2.1a Summary
of EPs under the Project and the Respective Work Contracts
Table 2.1b Summary
of Scope of Works under Concerned EP
Table
2.2 Key
Contacts of the Project
Table
2.3 Summary
Table for Major Site Activities in the Reporting Month
Table
2.4 Status
of Environmental Licences, Notifications and Permits
Table
3.1 Location
for Air Quality Monitoring Locations
Table
3.2 Air
Quality Monitoring Equipment
Table
3.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table
3.4 Summary
Table of 1-hour TSP Monitoring Results during the Reporting Month
Table
3.5 Summary
Table of 24-hour TSP Monitoring Results during the Reporting Month
Table
3.6 Observation
at Dust Monitoring Stations
Table
4.1 Location
for Noise Monitoring Stations
Table 4.2 Noise
Monitoring Equipment
Table
4.3 Noise
Monitoring Parameters, Duration and Frequency
Table
4.4 Summary
Table of Noise Monitoring Results during the Reporting Month
Table
4.5 Observation
at Noise Monitoring Stations
Table
5.1 Water
Quality Monitoring Parameters and Frequency
Table
5.2 Additional
Water Quality Monitoring Stations
Table
5.3 Water
Quality Monitoring Equipment
Table
5.4 Additional
Water Quality Monitoring Parameters and Frequency
Table
5.5 Method
for Laboratory Analysis for Water Samples
Table
6.1 Location
of Ambient Arsenic Monitoring station
Table
6.2 Ambient
Arsenic Monitoring Equipment
Table
6.3 Impact
Ambient Arsenic Monitoring Parameters, Frequency and Duration
Table
6.4 Summary
Table of 24-hour RSP Monitoring Results during the Reporting Month
Table 7.1 Landfill
Gas Monitoring Equipment
Table
8.1 Location
of Construction Vibration Monitoring
Table
8.2 Vibration
Monitoring Plan
Table
8.3 Vibration
Limits for Construction Vibration Monitoring
Table
9.1 Summary
Table of Avifauna Monitoring Results to Corresponding Action and Limit Levels
Table
9.4 Summary
Table of Mammal Monitoring Results to Corresponding Action and Limit Levels
Table
9.5 Summary
Table of Herpetofauna Monitoring Results to Corresponding Action and Limit
Levels
Table
9.6 Summary
Table of Butterfly Monitoring Results to Corresponding Action and Limit Levels
Table
9.7 Summary
Table of Odonata Monitoring Results to Corresponding Action and Limit Levels
Table 10.1 Summary of
Site Audit
Table 10.2 Observations
and Recommendations of Site Audit
Table 10.3 Summary
Table for the Outstanding item(s) in the reporting month
Table 10.4 Photographic
Records and Implementation Status of Measures
Table 10.6 Photographic
Records of Site Activities in LVNP
LIST OF DRAWINGS
LIST OF FIGURES
Figure
1 Location
of Air Quality Monitoring Station (KTN)
Figure
2 Location
of Air Quality Monitoring Station (FLN)
Figure
3 Location
of Noise Monitoring Station (KTN)
Figure
4 Location
of Noise Monitoring Station (FLN)
Figure
5 Location
of Additional Water Quality Monitoring Stations at River Beas
Figure
7 Location
of Ambient Arsenic Monitoring Station
Figure
8 Location
of Landfill Gas monitoring
Figure
10 Location
of Monitoring Stations at Ma Tso Lung Stream and Siu Hang Sun Tsuen Stream
Figure
12 Site
Layout Plan of Contract ND/2019/01 under EP-466/2013/A
Figure
13 Site
Layout Plan of Contract ND/2019/01 under EP-467/2013/A
Figure
14 Site
Layout Plan of Contract ND/2019/01 under EP/468-2013/A
Figure
15 Site
Layout Plan of Contract ND/2019/03 under EP-468/2013/A
Figure
16 Site
Layout Plan of Contract ND/2019/02 under EP-469/2013
Figure
17 Site
Layout Plan of Contract ND/2019/01 under EP-470/2013/A
Figure
18 Site
Layout Plan of Contract ND/2019/03 under EP-473/2013/A
Figure
19 Site
Layout Plan of Contract ND/2019/04 under EP-473/2013/A
Figure
20 Site
Layout Plan of Contract ND/2019/05 under EP-473/2013/A
Figure
21 Site
Layout Plan of Contract ND/2019/06 under EP-475/2013/A
Figure
22 Site
Layout Plan of Contract ND/2019/04 under EP-546-2017
LIST OF APPENDICES
Appendix
A Construction
Programme
Appendix
B Action
and Limit Levels
Appendix
C Copies
of Calibration Certificates
Appendix
D Environmental
Monitoring Schedules
Appendix
E Air
Quality and Ambient Arsenic Monitoring Results and Graphical Presentation
Appendix
F Noise
Monitoring Results and Graphical Presentation
Appendix
G Water
Quality Monitoring Results and Graphical Presentations
Appendix
H Laboratory
Testing Reports for Laboratory Analysis
Appendix
I Quality
Control Reports for SS and Arsenic Laboratory Analysis
Appendix
J Landfill
Gas Monitoring Results
Appendix
K Built
Heritage Monitoring Results
Appendix
L Ecological
Monitoring Results
Appendix
O Summary
of Exceedance
Appendix
Q Environmental
Mitigation Implementation Schedule (EMIS)
Appendix
R Waste
Generation in the Reporting Month
Appendix
T Summary
of Successful Prosecution
Appendix
U Summary
Table for Required Submission under Environmental Permits